Title 17 SUBDIVISIONS*
APPENDICES
SUBDIVISION IMPROVEMENT AGREEMENT
THIS AGREEMENT, made and entered into this _____ day of
__________, 19_____, by and between the CITY OF COLUMBIA FALLS of Flathead
County, Montana, Party of the First Part and hereinafter referred to as the
CITY, and _______________ (Name of Developer), a ____________________
(Individual, Company or Corporation)located at ____________________, (Street
Address/P. O. Box) ____________________ (City, County, State, Zip) Party of the
Second Part and hereinafter referred to as DEVELOPER.
WITNESSETH:
THAT WHEREAS, the Developer is the owner and developer of a
new subdivision known as _______________ (Name of Subdivision) located at
____________________ (Location of Subdivision) and,
WHEREAS, the City has conditioned it’s approval of the
final plat of _______________, _______________ (Name of Subdivision) upon the
conditions as set forth in the Preliminary Plat of the Subdivision being
completed and all improvements, as cited in "Exhibit A" have not been completed
at this time, and the Developer wishes to bond for the completion of those
improvements set forth in "Exhibit A"; and
WHEREAS, the Columbia Falls Subdivision Regulations require
that a subdivider shall provide a financial security of 125% of the estimated
total cost of construction of said improvements as evidenced by an estimate
prepared by a licensed public engineer included herewith as "Exhibit B";
and
WHEREAS, the estimated total cost of construction of said
improvements is the sum of $__________.
NOW THEREFORE, in consideration of the approval of the final
plat of said Subdivision by the City, the Developer hereby agrees as
follows:
1. The Developer shall deposit as collateral with the city a
Letter of Credit, or other acceptable collateral as determined by the city
council of Columbia Falls, in the amount of $__________. Said Letter of Credit
or other collateral shall have an expiration date of at least sixty (60) days
following the date set for completion of the improvements, certifying the
following:
a. That the creditor guarantees funds in the sum of
$__________ the estimated cost of completing the required improvements in
_______________ (Name of Subdivision)
b. That if the Developer fails to complete the specified
improvements within the required period, the creditor will pay to the City
immediately, and without further action, such funds as are necessary to finance
the completion of those improvements up to the limit of credit stated in the
letter;
2. That said required improvements shall be fully completed
by _______________, 19_____.
3. That upon completion of the required improvements, the
Developer shall cause to be filed with the city a statement certifying
that:
a. All required improvements are complete;
b. That the improvements are in compliance with the minimum
standards specified by the city for their construction and that the Developer
warrants said improvements against any and all defects for a period of one (1)
year from the date of acceptance of the completion of those improvements by the
City;
c. That the Developer knows of no defects in those
improvements;
d. That these improvements are free and clear of any
encumbrances or liens;
e. That a schedule of actual construction costs has been
filed with the City; and,
f. All applicable fees and surcharges have been
paid.
4. The Developer shall cause to be filed with the city copies
of final plans, profiles, grades and specifications of said improvements, with
the certification of the registered professional engineer responsible for their
preparation that all required improvements have been installed in conformance
with said specifications.
IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS
FOLLOWS, TO-WIT:
That the Developer shall provide for inspection of all
required improvements by a registered professional engineer before the Developer
shall be released from the Subdivision Improvement Agreement.
That if the city determines that any improvements are not
constructed in compliance with the specifications, it shall furnish the
Developer with a list of specific deficiencies and may withhold collateral
sufficient to insure such compliance. If the city determines that the Developer
will not construct any or all of the improvements in accordance with the
specifications, or within the required time limits, it may withdraw the
collateral and employ such funds as may be necessary to construct the
improvement or improvements in accordance with the specifications. The unused
portions of the collateral shall be returned to the Developer or the crediting
institution, as is appropriate.
IN WITNESS WHEREOF, the Parties have hereunto set their hands
and seals the day and year herein before written.
_________________________
(Name of Subdivision/Developer/Firm)
by
_________________________
(Title)
STATE OF MONTANA
COUNTY OF _______________
On this _____ day of __________, 19_____, before me, a Notary
Public for the State of Montana, personally appeared _______________, known to
me to be the _______________ of _______________, whose name is subscribed to the
foregoing instrument and acknowledged to me that he/she executed the
same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed
my Notarial Seal this day and year first above written.
_________________________
Notary Public for the State of Montana
Residing at
_________________________
_________________________
My Commission Expires _______________
CITY OF COLUMBIA FALLS
ATTEST:
_________________________
Connie Konopatzke
City Clerk
By:
_________________________
City Manager
By:
_________________________
Deputy
EXHIBIT A
Conditions of approval as fixed to the preliminary plat by
the City Council of Columbia Falls.
EXHIBIT B
This agreement specifically includes the following
improvements, their projected construction completion date and estimated
construction costs.
|
Check Appropriate Construction Improvements Box
|
Construction Completion Date
|
Estimated Costs
|
|
Street Grading/Paving
|
|
|
|
Street Base
|
|
|
|
Sidewalks
|
|
|
|
Curbs and Gutters
|
|
|
|
Sanitary Sewers
|
|
|
|
Mains
|
|
|
|
Other (_______________)
|
|
|
|
On-Site Sewage Facilities
|
|
|
|
Water Systems
|
|
|
|
Mains
|
|
|
|
Other (_______________)
|
|
|
|
On-Site Water Supply
|
|
|
|
Water Storage Tanks
|
|
|
|
Fire Hydrants
|
|
|
|
Storm Sewer or Drainage Facilities
|
|
|
|
Street Signs
|
|
|
|
Street Lighting
|
|
|
|
Street Monuments
|
|
|
|
Survey Monument Boxes
|
|
|
|
Landscaping
|
|
|
|
Other (_______________)
|
|
|
|
Subtotal
|
|
|
|
Fees
|
|
|
|
Totals Costs
|
|
|
|
Total Collateral (Totals Costs x 125%)
|
|
|