Title 15 BUILDINGS AND CONSTRUCTION
Chapter 15.16 MOVING BUILDINGS
15.16.020 Permit-Application.
The permit required by this chapter shall be obtained by
filing with the owner or agent of the owner of the building desired to be moved,
or by the contractor or other person who will do such moving. Such application
shall show the size, structure and general nature and character of the building
desired to be moved, the name of the owner thereof and of the persons who will
do the actual moving, the place of location from which and to which such
building is to be moved, and the route to be followed, and the date when it is
desired to move it and the estimated time of completion of the work. (Ord. 351
§ 2, 1978)