Title 15 BUILDINGS AND CONSTRUCTION
Chapter 15.04 ADMINISTRATIVE PROVISIONS
15.04.090 Factory-built buildings.
Factory-built buildings which are approved by the Montana
Building Code Division, Department of Administration, shall be subject to local
government inspection and fees for only zoning, utility connections and
foundations. Applications to the building official for erection and utility
connection shall be in accordance with Sections 15.04.050 and 15.04.070, and the
code. The fees for permits for factory-built buildings shall be as shown in the
Table No. 3-A of Section 303 of the Uniform Building Code with the construction
valuation based on the move-in, erection and setup costs for the building.
Valuation shall not be based on purchase price unless a portion of the purchase
price is for move-in and setup, in which case that portion shall be figured into
the construction valuation. Utility costs and foundation work shall be included
in the construction valuation. (Ord. 390 § 7, 1981)